HS Rear And Front Spar Fabrication

I assembled the rear spar with the HS-609PP spar reinforcements after I broke the edges of the spar reinforcements.
I installed all hinge brackets and I assembled the HS-411PP, HS-412PP, and VA-146 riveting the assembly together. This shop heads on this hinge have the correct diameter, however, they do not have the correct depth on the shop heads (rivets were too short, however, this is what was called out by the prints). A review of Van's instructions state that this may happen throughout building in certain applications and this is not of concern. A thread on the Yahoo Users Group indicated that other builders are experiencing the same thing. One builder stated that he called Van's on the issue and they stated that it was not a problem and that they required 6 rivets to hold the assembly which is way over what is actually needed.

Not a lot of detail here, however, this is was my first day working on the aircraft and I spent some time trying to figure out the prints and the instructions. I will come up with a system. If I don't go any faster than this, I won't be flying before I retire ![]()