GENERAL WING PREP
12/09/03-
Landing Lights And Fuel Caps Arrive
12/29/03- Wing Kit Arrival
01/04/04- Deburring Wing Ribs
01/05/04-
Question Regarding De-Burring Marks On Main Spars
01/09/04-
Drilling Plate Nuts On Main Wing Spars
01/10/04-
More Main Spar Plate Nut Drilling
01/11/04-
More Main Spar Assembly/Preparation
01/22/04-
Flop Tubes, Fuel Selectors, Sealants, etc,
02/13/04-
Pitot Tube And Brackets Arrive
03/14/04-
Fabricating Tiedowns And Rear Spar Preparation
03/16/04-
N-Number Registration With FAA
03/19/04-
Priming The Rear Spars
03/20/04-
Assembling The Rear Spars And DEBURRING RIBS
03/28/04-
Assembling The Wing Skeleton
03/29/04-
Drilling Ribs For Wiring Conduit
04/01/04-
Let the Rib Priming Marathon Begin
04/09/04-
Putting Up The Wing Stand
RIGHT WING
04/10/04-
Riveting Right Wing Skeleton / Mounting To Stand
04/11/04-
Fitting Right Wing Skins
04/12/04-
Fitting Right Wing Leading Edge
04/16/04-
Working The Bulges Out Of The Leading Edge
04/17/04-
Fabricating The Fuel Tank Z-Brackets
04/18/04-
TAKE TWO: Fabricating The Fuel Tank Z-Brackets AGAIN
04/21/04-
Installing Plate Nuts On The Z-Brackets
04/24/04-
Drilling The Fuel Tank And Leading Edge
04/25/04-
Deburring And Dimpling Wing Stuff
04/28/04-
Wing Tedium Continues BUT I Have Abrasives
05/01/04-
Riveting The Leading Edge
05/02/04-
Installing The Right Wing Landing Light
05/08/04-
Finishing The Right Wing Landing Light
05/19/04-
SPENDING MONEY
06/29/04-
Preppinng To Rivet Top Wing Skins
06/30/04-
Getting Closer To Riveting AND Airventure Reservations
07/01/04-
Leading Edge Is Riveted To Spar (Permanently)
07/03/04-
Riveting Top Skins To Wing Skeleton
07/09/04-
A Chance To Go Flying
LEFT WING
07/11/04-
Work On The Left Wing Begins (Riveting Skeleton / Mounting to Stand)
07/13/04-
Fitting The Left Wing Skins
07/18/04-
Building The Wing Stand
07/19/04-
Drilling The Leading Edge
07/20/04-
Drilling The Joint Plate And Fabricating Z-Brackets
07/21/04-
Assembling The Fuel Tank To Drill The Z-Brackets
07/23/04-
Drilling Z-Brackets And Working On The Leading Edge
12/01/05- Mounting The Gretz Aero Pitot Tube Mast
12/04/05- Drilling The Pitot Mounting Hardware To Wing
02/06/06- Installing The Left Wing Landing Light
02/19/06- Working Hard To Finish The Left Wing Landing Light
03/12/06- Wrapping Up The Left Wing Landing Light
09/16/07- Picking Up Where I Left Off (I Hope)
10/13/07- Riveting The Top Wing Skins
10/14/07- Assembling The Aileron Bellcranks
10/16/07- Routing Tubing For The Pitot Tube
|